The paper studies the problem of sequence optimisation inoverhaul activities production process modelling. Possibletasks, optimisation criteria and methods are analysed. Methodsfor solving two- or multi-phase production processes areillustrated on examples from practice. Special attention is paidto rules and criteria for selecting the optimal sequence in multi-phase production processes. For the given examples the optimalprocess sequence is presented graphically with the resultsanalysis.
D. D. Benjakovski, V. P. Storozev, V. S. Kondratenko:
Technology of Ship Repair, Transport, Moscow, 1986,
(in Russian)
Lj. Martic: Non-linear Programming, Information, Zagreb,
(In Croatian)
F. I. Paramonov: Modelling of the Production Processes,
Masinostroenie, Moscow, 1984 (In Russian)
D. T. Philips and odder: Operations Research- Plinciples
and Practice, J.Wiley, New York, 1976.
A. Villa, Z. Leicher: Production Scheduling and Control
ofTerm, Information, Zagreb, 1974 (In Croatian)
Guest Editor: Eleonora Papadimitriou, PhD
Editors: Dario Babić, PhD; Marko Matulin, PhD; Marko Ševrović, PhD.
Accelerating Discoveries in Traffic Science |
2024 © Promet - Traffic&Transportation journal