Decision Making on Government Subsidy for Highway Public-Private Partnership Projects in China Using an Iteration Game Model

Authors:

Yujie Huang
Shanghai Jiao Tong University

Hao Hu
Shanghai Jiao Tong University

Jinjin Chen
Shanghai Jiao Tong University

Lei Dai
Shanghai Jiao Tong University

Keywords:PPP (public-private partnership), government subsidy, game theory, real option, decision making, highway case study

Abstract

Government subsidy is an important responsibility of fiscal expenditure in public-private partnership (PPP) projects. However, an improper subsidy strategy may cause over-compensation or under-compensation. In this research, an iteration game model combining game theory and real option is established to describe the periodic decision-making process. The strategy game model is applied to characterize the behavioral interactions between stakeholders, and the real option theory is used to predict the project performance under the influence of their decisions. Besides, two new indicators, the efficiency of fund (SE) and the total extra cost paid by the private sector (ME), are proposed to evaluate the extra project revenue caused by each unit of the subsidy and the incentive effects of the subsidy. Consequently, the preliminary results indicate that a periodic and iterative negotiations regarding the subsidy will effectively improve the efficiency of fund compared to the traditional way. The results also show that it is important for the public sector to give incentives, encouraging the private sector to make more efforts on the project, rather than merely providing fund support. Further study will focus on more detailed and complicated behaviors of stakeholders based on the model proposed in this paper.

References

  1. China PPP Center. National PPP Information Platform Project Management Library 2019. Available from: http://www.cpppc.org/zh/pppjb/8718.jhtml [Accessed 15th Nov. 2020].

    Qingxue L, Hao H. How to Identify Spurious Transportation Public-Private Partnership Projects. 2018 IEEE Technology and Engineering Management Conference (TEMSCON). IEEE; 2018. p. 1-6. DOI: 10.1109/TEMSCON.2018.8488438

    Lara Galera A, Sanchez Solino A, Guirao Abad B. Sharing Risks in Toll Motorway Concessions: Subsidies as Real Options on Traffic Volume. Journal of Infrastructure Systems. 2018;24(4).

    Shen LY, Li H, Li QM. Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management. 2002;128(4): 326-30.

    Ye SD, Tiong RLK. NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management. 2000;126(3): 227-33.

    Shen LY, Wu YZ. Risk concession model for build/operate/transfer contract projects. Journa

Show more
How to Cite
Huang, Y. (et al.) 2021. Decision Making on Government Subsidy for Highway Public-Private Partnership Projects in China Using an Iteration Game Model. Traffic&Transportation Journal. 33, 3 (Jun. 2021), 399-412. DOI: https://doi.org/10.7307/ptt.v33i3.3567.

SPECIAL ISSUE IS OUT

Guest Editor: Eleonora Papadimitriou, PhD

Editors: Marko Matulin, PhD, Dario Babić, PhD, Marko Ševrović, PhD


Accelerating Discoveries in Traffic Science |
2024 © Promet - Traffic&Transportation journal