The importance of the Port of Ploče lies in serving the majority of the Bosnian market. However, the Pan-European Corridor Vc provides access to a much wider market in Central and South-Eastern Europe. The purpose of this paper is to express views on the future development of the Corridor and its consequential impact on the Port. This was conducted by means of analysis, comparison, and synthesis of cargo flow data and the dynamics data of the Corridor Vc construction. It covers the relations between Bosnia and Herzegovina (BiH) and the Republic of Croatia, and the assessment of importance of the Corridor in those countries. Statistical indicators show the importance of the Corridor completion for the successful execution of port development plans. The analysis of the Corridor status points to the current prevailing circumstances in BiH that make its realization ultimately uncertain, especially its railway component. The findings show that the most significant obstacles for a successful realization of Port of Ploče development plans are not only within the BiH internal geo-political relationships but in the disputes between BiH and the Republic of Croatia (RH) as well. Consequently, it has been shown that the Port of Ploče is not able to define and carry out the necessary measures toward BiH on its own but necessarily with the participation of the RH Government. The analysis offers observations and recommendations for improving relations with BiH, which would significantly advance the completion of the Corridor in BiH. In this way, it would allow for a full establishment of the Port of Ploče on target markets.
1 European commision. European commission Infrastructure - TEN-T - Connecting Europe Internet 2012; last accessed Nov 2016 Available from: http://ec.europa.eu/transport/themes/infrastructure/ten-t-guidelines/corridors/index_en.htm
2 Poletan JT.The integration of the Republic of Croatia into the Paneuropean Transport Corridor Network, Pomorstvo, 20, 2006; 52 – 57.
3 Dundović Č., Kesić B., Kolanović I. Značenje i uloga izgradnje prometnih koridora u razvitku luke Ploče, Pomorski zbornik 43, 2006; 114 – 118. Croatian
4 Rathman D.,Kružić B., Poletan JT., Analysis of the Competitiveness of Port of Ploče at the Container Transport Market and the possibilities for Improvement, Pomorstvo 29, 2015; 41 – 43.
5 Luka Šibenik 2017; last accessed Mar 2017. Available from http://lukasibenik.hr/
6 tris.com.hr 2014. Pojačan pretovar u luci šibenik ali i prašenje mineralnih gnojiva Internet cited 2016 Dec 21 Available from http://tris.com.hr/2014/06/pojacan-pretovar- u-luci-sibenik-ali-i-prasenje-mineralnih-gnojiva
7 Port of Šibenik Authority, last accessed Feb 2017 Available from http://www.portauthority-sibenik.hr/hrv/luka_sibenik/index.asp
8 Port of Zadar, last accessed Feb 2017 Available from http://www.luka-zadar.hr
9 Zelenika R.,Mrvičić A.,Pavlić SH. Analysis and assessment of efficiency degree in operation of cargo seaports in the republic of Croatia, Naše more 58(1-2)/2011,Rijeka 2011; 15,17
10 Port of Split Authority, last accessed Feb 2017 Available from http://portsplit.com/
11 Hrvatska. Državni zavod za statistiku. Statistička izvješća transport i komunikacije 2014. Zagreb, 2015; Croatian
12 Hrvatska. Državni zavod za statistiku. Statistička izvješća transport i komunikacije 2011. Zagreb, 2012; Croatian
13 Hrvatska. Državni zavod za statistiku. Promet u morskim lukama od 2006. do 2010. Zagreb, 2011; Croatian
14 Hrvatska. Državni zavod za statistiku. Statistička izvješća transport i komunikacije 2012. Zagreb, 2013; Croatian
15 Hrvatska. Državni zavod za statistiku. Statistička izvješća transport i komunikacije 2013. Zagreb, 2014; Croatian
16 Hrvatska. Državni zavod za statistiku. Statistička izvješća transport i komunikacije 2015. Zagreb, 2016; Croatian
17 Poletan JT., Jolić N., Kavran Z. Comparative Analysys of Cargo Flows on Branches Vb and Vc of the Pan-European Corridor Vc, Promet – traffic & transport 21, 2009; 209, 212 – 213.
18 Poletan JT. Analiza relevantnih indikatora formiranja robnih tokova na paneuropskom koridoru Vc Pomorstvo, 22, 2008; 201 – 205. Croatian
19 Ploče Port Authority, cited 2016 Nov 16 Available from http://www.ppa.hr/index.php/2015-04-17-08-54-45/kontejnerski-terminal.html
20 poslovni.hr 2016. Za dvije godine uvozit ćemo UNP morskim putem Internet, cited 2016 Dec 19 Available from http://www.poslovni.hr/poduzetnik/za-dvije-godine-uvozit-cemo-unp-morskim-putem-309449
21 Luka Ploče d.d. Godišnje izvješće i konsolidirani i nekonsolidirani financijski izvještaji za Društvo luka Ploče za 2016. godinu, Croatian. Ploče: Luka Ploče d.d; 2017. cited 2017 Mar 18 Available from http://www.luka-ploce.hr/repository/files/0/f/0fd60820af0bf3ac5c43ccfffac0c83d.pdf
22 BiH. Nacrt Strategije rasta izvoza BiH od 2012. do 2015. godine, 2011; 113 – 114, Croatian. Izvozno vijeće BiH, 2011. cited 2016 Nov 23 Available from: http://komorabih.ba/wp-content/uploads/2013/06/bhepa-nacrt-strategija-rasta-izvoza-bih.pdf
23 vlakovi.hr Koridori u HrvatskojInternet, last accessed Aug 2016 Available from http://www.vlakovi.hr/?page_id=2701
24 Hrvatska. Modernizacija-zeljeznica. Zagreb: Ministry of Maritime Affairs, Transport and Infrastructure last accessed Nov 2016 Available from: http://www.promet-eufondovi.hr/modernizacija-zeljeznica
25 večernji.ba 2016. do-2020-izgradit-cemo-dvije-trecine-autoceste-na-koridoru-5c Internet, cited 2017 Mar 16 Available from https://www.vecernji.ba/vijesti/do-2020-izgradit-cemo-dvije-trecine-autoceste-na-koridoru-5c-1063833
26 večernji.ba 2015. realno-je-da-koridor-vc-bude-izgraden-do-2022-godine Internet, cited 2017 Mar 16 Available from https://www.vecernji.ba/vijesti/realno-je-da-koridor-vc-bude-izgraden-do-2022-godine-1030396
27 European Commission. Support to Bosnia and Herzegovina in implementation of the commitments in Transport Sector under the Stabilisation and Association Agreement; 3-4, 21- 22 last accessed Dec 2016 Available from: http://ec.europa.eu/enlargement/pdf/bosnia_and_herzegovina/ipa/2012/7pf_transportbih2012.pdf
28 Čulo K.,Skenderović V. The Challenge of Removing Freight traffic Bottlenecks on the Corridor Vc. Presentation The world bank, University of Osijek, 2005.
29 South East Europe Transport Observatory (SEETO) 2013. Summary of Infrastructure Limitations, 2013; last accessed Nov 2016 Available from: http://www.seetoint.org/wp-content/uploads/downloads/2014/11/1_Corridor_Vc.pdf
30 Marić D. Corridor Vc as a Factor of Integration of Bosnia and Herzegovina into the European Union, Faculty of Sceince, University of Banja Luka, 2012; 94, 96 – 100. DOI: 10.2298/IJGI1201089M
31 vijesti.ba 2012. Bih-bi-izgradnjom-luke-neum-prestala-biti-ovisna-od-luke-ploce Internet, cited 2016 Sep 16 Available from http://vijesti.ba/clanak/98287/bih-bi-izgradnjom-luke-neum-prestala-biti-ovisna-od-luke-ploce
32 Kos S., Brčić D., Karmelić J. Strukturna analiza kontejnerizacije hrvatskih luka, Pomorstvo 24, 2010; 200, 203 – 204. Croatian
Guest Editor: Eleonora Papadimitriou, PhD
Editors: Dario Babić, PhD; Marko Matulin, PhD; Marko Ševrović, PhD.
Accelerating Discoveries in Traffic Science |
2024 © Promet - Traffic&Transportation journal