A Generalised Stock-Out Function for Continuous Production Variables

Authors:Ou Tang

Abstract

This paper follows up a previous study for optimising a production-inventory system when external demand is stochastic.A modified stock-out function is presented to cover more generalsituation when cumulative production may be a continuousvariable. Optimisation equations are further investigated,including the sufficient conditions for optimisation.

Keywords:stock-out function, stochastic demand, inventory

References

  1. Andersson, L. E. and Grubbs trom, R. W. (1994),

    Asymptotic Behaviour of a Stochastic Multi-Period JnventOiy

    Process with Planned Production, Working Paper

    WP-210, Department of Production Economics,

    Linkoping Insti tute of Technology

    Grobbstrom, R. W. (1996), Stochastic Properties of

    a Production-Inventory Process with Planned Production

    Using Transform Methodology, International

    Journal of Production Economics, Vol. 45, pp. 407-

    -419

    Grubbstrom, R. W. and Molinder, A (1996), Safety

    Stock Plans in MRP-Systems Using Transform Methodology,

    i nternational Joumal of Production Economics,

    Vol. 46-47, pp. 297-309

    Grubbstrom, R. W. (1998), A Net Present Value Approach

    to Safety Stocks in Planned Production, international

    Journal of Production Economics, Vol. 56-57,

    pp. 213-229

    Grubbstrom, R. W. and Tang, 0. (1997), Further Developments

    on Safety Stock in an MRP System Applying

    Laplace Transjom1s and input-Output Analysis, Internationalfournal

    of Production Economics, forthcoming

Show more


Accelerating Discoveries in Traffic Science |
2024 © Promet - Traffic&Transportation journal